rev 02/04/02 - 12/13/01 2nd Draft - Project Plan River Forecast Center Operational Backup Using LINUX PCs 1) Introduction Objective Implementation of this proposal will provide
complete and flexible RFC operational backup capabilities. The system will have
the flexibility to be utilized for all levels and durations of operational outages.
Implementation will feature RFC data ingest using typical and alternative sources,
complete computational capabilities for river forecast model and other operational
software applications, hydrometeorological situation monitoring and product
dissemination. The system will be implemented for use locally at the RFC, locally
using the co-located WFO equipment, remotely at a neighbor WFO and remotely
at any location with Internet capability including other cooperating agencies
facilities, RFC personnel's residences and etc. Need RFC backup capabilities have never existed.
There are no viable plans now under consideration. Currently, there is no backup
method for providing RFC products and services due to hardware, software, communications
and/or facility damage or outages at any particular RFC. The affected WFOs are
simply required to continue providing normal hydrologic warnings, watches and
statements with limited or no support from the RFC. The LINUX hydrology software
to be delivered in AWIPS Build 5.2 (approximately April 2002) does not provide
for flexible backup capabilities since it is primarily simply a platform move
of existing capabilities. Benefits Implementation will provide complete and flexible RFC backup capabilities for the first time. It seems very reasonable that before we can properly tout anything as being "advanced" in AHPS that we implement backup capability for the RFCs. 2) Significant Activity Descriptions
3) Deliverables - Specific
deliverables from this team include the following. a) Implement flexible RFC operational backup capability at SR RFCs using LINUX PCs including the following options.
iii) Using remote WFO AWIPS and other systems capabilities. iv) Using non-NWS facility configuration such as laptops at local Red Cross office. b) Recommend National RFC Backup Methods Using PCs.
4) Project Life - This project will provide the above deliverables by the end of FY 2002. |