Item
|
Description
|
Responsibility
|
Target Date
|
1 |
Improve definition and tracking of requirements, including
use of a requirements database. |
OS/HSD |
Continuing |
2 |
Donna to prepare and initial list of requirements to jump-start the process
and send to RFC's for prioritization |
Donna, RFC's |
ASAP |
3 |
OS/HSD to convene a conference concerning hydrology GIS functional requirements |
OS/HSD |
ASAP |
4 |
QPF verification should consider both timing and spatial errors |
Graziano |
December, 2000 |
5 |
RFC's to assure that the best possible QPE data are being sent to Bret
McDonald |
RFC's |
Continuing |
6 |
Review RFC-wide distribution schedule to see if it can be sistributed
before AWIPS build 5.1 |
Jay Breidenbach |
ASAP |
7 |
EMC would like to have RFC's participate in reviewing streamflow simulations
for a few selected places in each RFC area. Guidelines to be prepared for
RFC selection. |
Mitchell/Schaake/RFC's |
ASAP |
8 |
Set-up explanation of ESP as part of AHPS web site |
Ingram |
ASAP |
9 |
Implement and test site-specific procedure suggested by L. Larsen |
Donna, MBRFC (Black) |
ASAP |
10 |
Recognize the reality that we must have one NWS hydrology program so there
is no "we" and "they", only "us" |
RFC's, Regions, NWSH |
Continuing |
11 |
RFC Computational Backup |
RFC's, OS/HSD |
|
12 |
Initial parameters for Sacramento model to be derived using Victor's approach
at 1/8 degree resolution and made available to RFC's via web. |
Schaake |
October, 2000 |
13 |
Select a hydrologic forecast verification database. |
OH, ABRFC |
Sept, 2000 |
14 |
Provide guidance for verification stage/flow levels |
OH,Regions |
December, 2000 |
15 |
Complete daily and hourly processed NCDC data sets together with a plan
for making these available to the RFC's |
Schaake |
December, 2000 |
16 |
Collaborate with NCEP/CPC to produce hourly precipitation analyses at
1/8 degree resolution from 1948 - present |
Schaake |
TBD |